Skip to content
Industrial · Commercial · Residential  |  Serving Metro Atlanta
Free inspections · No-pressure estimates Call 440-610-3216
Roof Solutions — industrial, commercial and residential roofing in Atlanta, GA
Free Roof Inspection

Home/Commercial Roofing/Commercial Roof Repair

Commercial Roof Repair in Atlanta, GA

The cheapest roofing money a property owner ever spends is on the repair that happens before the insulation gets wet.

The Economics Nobody Explains To Building Owners

A membrane breach caught in year one is a few hundred dollars of seam work. The same breach found in year four has soaked a few thousand square feet of polyiso, which now has to come out, which means the repair is no longer a repair — it is a partial replacement with a tenant disruption attached.

The membrane is not usually what fails. The details are: terminations, curbs, penetrations, drains. And those are all inspectable, cheaply, on a schedule.

What a maintenance program covers

Twice-yearly inspection, drain and scupper clearing, debris removal, seam and termination check, penetration reseal, and a written condition report with photos each visit. It costs a fraction of a replacement and routinely doubles the service life of a single-ply roof.

Commercial Repairs We Handle

Leak Tracing

Moisture probing, core samples and infrared scanning to find where water is actually entering — not where it is showing up.

Seam & Membrane Repair

Re-welding TPO and PVC, re-seaming EPDM, patching punctures and repairing blistered areas to manufacturer spec.

Flashing & Terminations

Parapet walls, curbs, expansion joints and termination bar rebuilds where the membrane has pulled away.

Drainage Corrections

Drain and scupper repair, strainer replacement and tapered insulation to eliminate chronic ponding.

Penetration Rebuilds

Pipes, conduit, mechanical curbs and equipment supports detailed properly instead of buried in sealant.

Wet Insulation Removal

Cut out and replace saturated areas before anything new goes over them. Skipping this step is why roofs get paid for twice.

Working Around Your Tenants

Commercial roof work fails commercially long before it fails technically — blocked entrances, noise during business hours, debris in the parking lot, crews walking through leased space. We plan around all of it.

  • Phased scheduling by section, with every area dried in before the crew leaves
  • Staging and crane placement coordinated with property management, not announced to it
  • Night and weekend scheduling where daytime noise is not workable
  • Tenant notice packets so you are not fielding the calls
  • Daily site cleanup with photo documentation of progress

Commercial Roof Repair FAQs

How quickly can you respond to a commercial roof leak?

Same day for active leaks threatening inventory, equipment or tenant operations. We stabilize first, then diagnose. Our emergency line runs 24/7 at 440-610-3216.

Do you offer roof maintenance contracts?

Yes — typically twice-yearly inspection with drain clearing, seam and termination checks, penetration reseals and a written photo report each visit. For most building owners it is the highest return per dollar in the entire roofing budget.

Can you repair a roof that is still under warranty?

We can, but check the warranty terms first. Many manufacturer warranties require an approved applicator to perform repairs, and unauthorized work can void coverage. We will help you read the document before touching anything.

How do you find a leak on a large roof?

Systematically. Visual survey of the usual failure points, then moisture probing and core sampling to map saturation, then infrared scanning on larger decks — wet insulation holds heat after sundown and shows clearly on thermal imaging. Water testing by section when the entry point stays elusive.

What does commercial roof repair cost?

Small detail repairs commonly run $500 to $2,500. Larger scopes involving wet insulation removal and membrane replacement are priced by area, generally $9 to $18 per square foot of affected roof. We scope after diagnosis, not before.

Next Step

Get Ahead Of It

A scheduled assessment now costs a fraction of the replacement you are trying to postpone.